Keystone Power Plant/RRI/Gai Consultant letter of open access 5/26/2010
Permission given to return the trail to the orginal corridor or close to it. This is after the construction.
AR-M317_20100625_073525.pdf — 46 KB
AR-M317_20100625_073525.pdf — 46 KB